A carregar

Lean & Sustainable Factory 2023

BIW empty skid buffer increase

Bodyshop

-

New Empty Skid Unstacker

Scroll for measure details

Area

Bodyshop

Implementation date

2023

Click Play to start the video

Before

  1. The BiW (Body in White) buffer supply P100 with bodies.
  2. If the system is full, the return of empty skids stops.
  3. The P100 cannot release the empty skid, and the production feed to Paint stops.

After

Install a new unstack system to increase empty skid storage by 35.

Project figures

Investment

125T €

Saving

1,1% uptime improvement

Results/improvements

The improvement will increase the flexibility of the line and will increase P100 uptime by 1,1% (currently 96%).

125T €

1,1% uptime improvement

The improvement will increase the flexibility of the line and will increase P100 uptime by 1,1% (currently 96%).